{"id":48816,"date":"2015-10-05T10:13:43","date_gmt":"2015-10-05T07:13:43","guid":{"rendered":"http:\/\/targovistenews.ro\/live\/?p=48816"},"modified":"2015-10-05T10:13:43","modified_gmt":"2015-10-05T07:13:43","slug":"ultimele-noutati-despre-podul-de-la-viisoara-cand-incep-lucrarile","status":"publish","type":"post","link":"https:\/\/targovistenews.ro\/live\/ultimele-noutati-despre-podul-de-la-viisoara-cand-incep-lucrarile\/","title":{"rendered":"Ultimele nout\u0103\u0163i despre podul de la Vii\u015foara! C\u00e2nd \u00eencep lucr\u0103rile"},"content":{"rendered":"<p><strong><a href=\"http:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2015\/10\/podviis.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-48817\" alt=\"podviis\" src=\"http:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2015\/10\/podviis.jpg\" width=\"646\" height=\"404\" srcset=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2015\/10\/podviis.jpg 646w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2015\/10\/podviis-300x187.jpg 300w\" sizes=\"auto, (max-width: 646px) 100vw, 646px\" \/><\/a>\u201eLa Compania Na\u0163ional\u0103 de Drumuri s-a semnat contractul pentru lucr\u0103ri de punere \u00een siguran\u0163\u0103 a podului de pe DN 72 km 20+422 peste r\u00e2ul D\u00e2mbovi\u0163a, la Vii\u015foara. <\/strong><\/p>\n<p><strong>Beneficiarul lucr\u0103rii este Compania Na\u0163ional\u0103 de Drumuri, prin Direc\u0163ia Regional\u0103 de Drumuri \u015fi Poduri Bucure\u015fti, constructor este asocia\u0163ia INFRA SYSTEM PROIECT SRL \u015fi LUCONSA BM, cu sus\u0163in\u0103tor VIA CARPATICA. <\/strong><\/p>\n<p><strong>Valoarea contractului, proiectare plus execu\u0163ie, este 6.162.435,87 lei plus TVA. Durata de execu\u0163ie a lucr\u0103rilor este de 3 luni, se vor face praguri de fund, ap\u0103r\u0103ri de maluri, recalibrare \u015fi regularizare albie, lucr\u0103ri de protejare a pilonilor infrastructurii \u015fi consolidarea terenului de la baza acestora.<\/strong><\/p>\n<p><strong>Luni se va face predarea amplasamentului, iar c\u00e2\u015ftig\u0103torii licita\u0163iei au 10 zile pentru depunerea documentelor \u015fi garan\u0163iilor prev\u0103zute de lege. Apoi se va trece la faza de proiectare, respectiv faza de execu\u0163ie. <\/strong><\/p>\n<p><strong>Asta \u00eenseamn\u0103 c\u0103 undeva \u00een luna februarie, \u00eenceputul lui martie, podul de la Vii\u015foara va fi pus \u00een siguran\u0163\u0103 \u015fi urmeaz\u0103 apoi proiectul mai mare, de lucr\u0103ri suplimentare de amenajare a podului respectiv. <\/strong><\/p>\n<p><strong>\u00cen paralel, Compania Na\u0163ional\u0103 Apele Rom\u00e2ne, prin Direc\u0163ia Arge\u015f-Vedea, va efectua lucr\u0103ri de calibrare a albiei \u015fi de realizare a unor elemente care practic s\u0103 \u00eencetineasc\u0103 curgerea apei \u015fi s\u0103 asigure siguran\u0163a podului\u201d, a declarat pre\u015fedintele Consiliului Jude\u0163ean D\u00e2mbovi\u0163a, Adrian \u0162u\u0163uianu.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201eLa Compania Na\u0163ional\u0103 de Drumuri s-a semnat contractul pentru lucr\u0103ri de punere \u00een siguran\u0163\u0103 a podului de pe DN 72 km 20+422 peste r\u00e2ul D\u00e2mbovi\u0163a, la Vii\u015foara. Beneficiarul lucr\u0103rii este Compania Na\u0163ional\u0103 de Drumuri, prin Direc\u0163ia Regional\u0103 de Drumuri \u015fi&#8230;<\/p>\n","protected":false},"author":2,"featured_media":48817,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-48816","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-c3-politic"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts\/48816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/comments?post=48816"}],"version-history":[{"count":2,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts\/48816\/revisions"}],"predecessor-version":[{"id":48819,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts\/48816\/revisions\/48819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/media\/48817"}],"wp:attachment":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/media?parent=48816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/categories?post=48816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/tags?post=48816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}