{"id":123882,"date":"2021-07-06T09:57:09","date_gmt":"2021-07-06T06:57:09","guid":{"rendered":"http:\/\/targovistenews.ro\/live\/?p=123882"},"modified":"2021-07-06T09:57:22","modified_gmt":"2021-07-06T06:57:22","slug":"vizite-la-mai-multe-obiective-de-investitii-ce-vizeaza-infrastructura-rutiera-din-judet","status":"publish","type":"post","link":"https:\/\/targovistenews.ro\/live\/vizite-la-mai-multe-obiective-de-investitii-ce-vizeaza-infrastructura-rutiera-din-judet\/","title":{"rendered":"Vizite la mai multe obiective de investi\u021bii ce vizeaz\u0103 infrastructura rutier\u0103 din jude\u021b"},"content":{"rendered":"\n<p>Agenda de lucru a pre\u0219edintelui Consiliului Jude\u021bean D\u00e2mbovi\u021ba (CJD), Corneliu \u0218tefan, a debutat \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103 cu vizite la mai multe obiective de investi\u021bii ce vizeaz\u0103 infrastructura rutier\u0103 din jude\u021b. Termenele asumate de constructori \u0219i modul de realizare a contractelor de lucr\u0103ri au reprezentat scopul deplas\u0103rii pre\u0219edintelui Corneliu \u0218tefan, \u00een zona de sud a jude\u021bului.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-2-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-2-1-1024x683.jpg\" alt=\"\" class=\"wp-image-123883\" srcset=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-2-1-1024x683.jpg 1024w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-2-1-300x200.jpg 300w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-2-1-768x512.jpg 768w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-2-1.jpg 1199w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Vizita a debutat la obiectivul de investi\u021bi&nbsp;<em>\u201e<\/em><em>Punere \u00een siguran\u021b\u0103 pod peste Arge\u0219 pe DJ 711A, km 36+904 la Potlogi\u201d<\/em>, \u00een valoare de 12.475.471 lei, al c\u0103rui beneficiar este Consiliul&nbsp; Jude\u021bean D\u00e2mbovi\u021ba. P\u00e2n\u0103 \u00een prezent, au fost f\u0103cute lucr\u0103ri de deviere a cursului de ap\u0103, realiza\u021bi pilo\u021bii fora\u021bi (coloane Benotto), \u00een num\u0103r de 110 elemente \u0219i aproximativ 95% din radierul armat al deversorului pe malul st\u00e2ng.<\/p>\n\n\n\n<p>Totodat\u0103, printr-o mobilizare corespunz\u0103toare de personal \u0219i utilaje, sunt \u00een curs de finalizare lucr\u0103rile la pragul din zona central\u0103 a albiei, urm\u00e2nd ca \u00een scurt timp, r\u00e2ul Arge\u0219 s\u0103 fie deviat pe cursul normal pentru a se permite \u00eenceperea \u0219i finalizarea lucr\u0103rilor pe malul drept.<\/p>\n\n\n\n<p>Situa\u021bia obiectivului de investi\u021bii \u201ePod peste r\u00e2ul Arge\u0219, km 31+040, la Ungureni, Corbii Mari\u201d s-a aflat \u0219i ast\u0103zi \u00een aten\u021bia pre\u0219edintelui CJD, Corneliu \u0218tefan, \u00eentruc\u00e2t lucr\u0103rile nu se desf\u0103\u0219oar\u0103 \u00een condi\u021bii corespunz\u0103toare din punct de vedere al capacit\u0103\u021bilor de personal \u0219i echipamentelor, acestea fiind suspendate de c\u0103tre executant, iar circula\u021bia public\u0103 \u00eenchis\u0103 peste pod, tot la solicitarea constructorului.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-26-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-26-1-1024x683.jpg\" alt=\"\" class=\"wp-image-123884\" srcset=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-26-1-1024x683.jpg 1024w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-26-1-300x200.jpg 300w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-26-1-768x512.jpg 768w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-26-1.jpg 1199w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Valoarea investi\u021biei este de 9.426.842,29 lei. Podul are o lungime de 277,96 m, l\u0103\u021bimea de 9 m,&nbsp; partea carosabil\u0103 fiind de 7 m. Dat\u0103 fiind situa\u021bia constatat\u0103 la obiectiv, pre\u0219edintele CJD a convocat o \u00eent\u00e2lnire cu liderul asocierii reprezent\u00e2nd executantul, pentru m\u00e2ine, 6 iulie, ora 8:00, \u00een vederea debloc\u0103rii situa\u021biei.<\/p>\n\n\n\n<p>Pe parcursul vizitei, pre\u0219edintele CJD, Corneliu \u0218tefan, a fost \u00eenso\u021bit de administratorul public al jude\u021bului, Cristian Avanu, directorul executiv al Direc\u021biei Tehnice, Vasile Dinu \u0219i Florin Gilia, \u0219ef serviciu &#8211; Serviciul Programe Europene, din cadrul Direc\u021biei Strategii, Programe \u0219i Investi\u021bii.<\/p>\n\n\n\n<p>Un alt obiectiv de investi\u021bii, derulat cu fonduri de la Consiliul Jude\u021bean D\u00e2mbovi\u021ba \u0219i care a fost parcurs ast\u0103zi este \u201ePod pe DJ 722 la Mircea Vod\u0103\u201d, \u00een valoare de 1.824.331,44 lei. Podul are o lungime de 23,50 m, iar lucr\u0103rile efectuate au presupus realizarea, \u00een totalitate, a unui obiectiv nou, deosebit de important la nivelul jude\u021bului D\u00e2mbovi\u021ba \u0219i UAT S\u0103lcioara, acesta fiind \u00een perioada de prerecep\u021bie.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-15-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-15-1-1024x683.jpg\" alt=\"\" class=\"wp-image-123885\" srcset=\"https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-15-1-1024x683.jpg 1024w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-15-1-300x200.jpg 300w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-15-1-768x512.jpg 768w, https:\/\/targovistenews.ro\/live\/wp-content\/uploads\/2021\/07\/au-inceput-verificarile-in-teren-la-obiectivele-de-investitii-derulate-de-cjd-15-1.jpg 1199w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Vizita a continuat la lucr\u0103rile ce se desf\u0103\u0219oar\u0103 pe loturile I \u0219i II \u00een cadrul proiectului finan\u021bat \u00een cadrul Programului Opera\u021bional Regional 2014 \u2013 2020 \u201eDezvoltarea infrastructurii de transport jude\u021bean prin modernizarea DJ 720, DJ 720B, DJ 711 \u0219i DJ 101B, pe traseul limit\u0103 Jude\u021b Prahova \u2013 Moreni \u2013 Gura Ocni\u021bei \u2013 R\u0103zvad \u2013 Ulmi \u2013 T\u00e2rgovi\u0219te \u2013 Comi\u0219ani \u2013 Buc\u0219ani \u2013 B\u0103leni \u2013 Dobra \u2013 Finta \u2013 Bilciure\u0219ti \u2013 Cojasca \u2013 Corne\u0219ti \u2013 Butimanu \u2013 Nicule\u0219ti \u2013 limit\u0103 Jude\u021b Ilfov\u201d, proiect \u00een valoare de 212.845.189,34 lei.<\/p>\n\n\n\n<p>Lotul I cuprinde traseul &nbsp;DJ 702B Ulmi \u2013 Gura Ocni\u021bei \u0219i DJ 720 Gura Ocni\u021bei \u2013 Moreni \u2013 limit\u0103 Jude\u021b Prahova, \u00een lungime total\u0103 de 13,169 km, iar lotul II \u2013 DJ 711 Ulmi \u2013 Comi\u0219ani \u2013 B\u0103leni, \u00een lungime de 16 km.<\/p>\n\n\n\n<p>Lucr\u0103rile aflate \u00een desf\u0103\u0219urare, pe cele dou\u0103 loturi, verificate de c\u0103tre echipa CJD au fost at\u00e2t din categoria celor aferente p\u0103r\u021bii carosabile, respectiv terasamente \u0219i a\u0219ternere mixturi asfaltice, c\u00e2t \u0219i din categoria asigur\u0103rii scurgerii apelor la rigolele carosabile \u0219i realiz\u0103rii lucr\u0103rilor de refacere a c\u0103ii de rulare pentru podul peste Ialomi\u021ba, aflat \u00een fazele finale de punere \u00een func\u021biune.<\/p>\n\n\n\n<p>Pre\u0219edintele Corneliu \u0218tefan:<em>&nbsp;\u201e\u0218i prin deplas\u0103rile pe care le-am realizat ast\u0103zi, am vrut s\u0103 m\u0103 asigur c\u0103 se lucreaz\u0103 \u00een ritm sus\u021binut la \u00eembun\u0103t\u0103\u021birea infrastructurii rutiere \u0219i de utilit\u0103\u021bi. A\u0219a cum am promis, voi continua s\u0103 iau la pas fiecare investi\u021bie, fie c\u0103 este a consiliului jude\u021bean, fie c\u0103 se deruleaz\u0103 din bugetele administra\u021biilor locale sau alte surse guvernamentale\u201d.&nbsp;<\/em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>&nbsp; &nbsp; &nbsp;Compartimentul Imagine, Rela\u021bii Externe al Consiliului Jude\u021bean D\u00e2mbovi\u021ba<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Agenda de lucru a pre\u0219edintelui Consiliului Jude\u021bean D\u00e2mbovi\u021ba (CJD), Corneliu \u0218tefan, a debutat \u00een aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103 cu vizite la mai multe obiective de investi\u021bii ce vizeaz\u0103 infrastructura rutier\u0103 din jude\u021b. Termenele asumate de constructori \u0219i modul de realizare a contractelor&#8230;<\/p>\n","protected":false},"author":2,"featured_media":123883,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[],"class_list":["post-123882","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-c23-cjd"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts\/123882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/comments?post=123882"}],"version-history":[{"count":1,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts\/123882\/revisions"}],"predecessor-version":[{"id":123886,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/posts\/123882\/revisions\/123886"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/media\/123883"}],"wp:attachment":[{"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/media?parent=123882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/categories?post=123882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/targovistenews.ro\/live\/wp-json\/wp\/v2\/tags?post=123882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}